Sorrento Lumber & Concrete ready-mix truck with a Louisiana concrete ordering checklist covering delivery address, estimated cubic yards, required PSI, pour schedule, placement method, and truck access.

How to Order Ready-Mix Concrete in Louisiana

How to Order Ready-Mix Concrete in Louisiana: What You Need

To order ready-mix concrete in Louisiana, you need five essential details: your jobsite location, estimated cubic yards, required concrete strength (PSI), preferred pour date, and project specifications. You should also confirm truck access, placement methods, and jobsite readiness before scheduling delivery.

Missing or incorrect information can disrupt your concrete delivery and construction schedule.

Whether you’re preparing a driveway, foundation, or commercial pour, this guide walks you through the concrete ordering process. Sorrento Lumber & Concrete supplies ready-mix concrete throughout its South Louisiana service area, with a dedicated quote process to help you get started.

Ready-Mix Concrete Ordering

Planning a Concrete Pour in Louisiana?

Have your jobsite address, estimated cubic yards, required PSI, and preferred pour date ready. Start a concrete quote so Sorrento’s dispatch team can review your project details.

Start My Ready-Mix Concrete Quote

1. Start With the Exact Project Location

The supplier needs to know where the concrete is going.

Have the following ready:

  • Jobsite address
  • Closest intersection if the address is difficult to find
  • Project name, if applicable
  • Any access restrictions or unusual route conditions

Location helps the supplier understand which plant may be best positioned to serve the project and what the delivery route may involve.

For industrial sites, commercial developments, rural properties, or restricted-access areas, also mention gates, security procedures, narrow roads, low clearances, or other conditions that could affect a mixer truck.

You can review the Sorrento Lumber & Concrete locations before submitting the project information.

2. Know How Many Cubic Yards You Need

Ready-mix concrete is ordered by the cubic yard.

Before requesting a quote, calculate or confirm the volume needed for the project. Length, width, and thickness all affect the final yardage.

For a basic rectangular slab:

Length × Width × Thickness ÷ 27 = Cubic Yards

Make sure all measurements are converted to feet before using the formula.

The calculated quantity is only a starting point. Thicker sections, footings, uneven subgrade, form dimensions, and normal jobsite variation can change the amount required.

If a contractor, estimator, or engineer has already calculated the concrete volume, use the project quantity rather than replacing it with a generic estimate.

For additional industry guidance, the National Ready Mixed Concrete Association and American Society of Concrete Contractors provide a Checklist for Ordering and Scheduling Ready Mixed Concrete. It is intended to simplify the ordering process by identifying information the purchaser and supplier should clarify.

3. Have the Plans or Specifications Ready

For engineered projects, the plans and specifications should control the concrete requirements.

Do not choose a mix only because it worked on another job.

Project documents may specify:

  • Required compressive strength
  • Slump
  • Air content
  • Aggregate requirements
  • Fibers
  • High-early-strength requirements
  • Admixtures
  • Testing requirements
  • Placement or exposure requirements

Sorrento Lumber & Concrete can review the project information, but engineered work should follow the approved plans, specifications, and mix submittals rather than a generic mix recommendation.

This is especially important for commercial, municipal, heavy civil, and industrial projects.

For larger jobs, the NRMCA pre-construction checklists can help project stakeholders define responsibilities and procedures before concrete work begins. NRMCA notes that these meetings can address ordering, scheduling, mixture requirements, equipment, placement, testing, curing, and acceptance procedures.

The American Concrete Institute also provides technical resources on ready-mixed concrete, including standards, manuals, testing guidance, and construction references.

4. Know the Requested Pour Date

When requesting a ready mix concrete quote, provide the date you are hoping to pour.

A requested date helps the supplier understand the project schedule, but it should not be treated as a guaranteed delivery time until the order and schedule are confirmed.

Useful information includes:

  • Requested pour date
  • Approximate start time
  • Expected duration
  • Total volume
  • Whether the placement will happen continuously or in multiple stages

For larger jobs, providing the anticipated sequence early helps estimating and dispatch understand the scope of the work.

5. Explain How the Concrete Will Be Placed

The supplier should know how the concrete will move from the truck to the final placement area.

Common placement methods include:

  • Direct discharge from the mixer
  • Concrete pump
  • Conveyor
  • Buggy
  • Wheelbarrow or other jobsite equipment

The placement method can affect jobsite preparation and project-specific concrete requirements.

If a pump will be used, communicate that early so the contractor, pump operator, and concrete supplier are working from the same project information.

NRMCA also provides a specific pre-construction checklist for pumping ready-mixed concrete as part of its concrete planning resources. NRMCA

Concrete Delivery Planning

Are Your Mix and Delivery Details Ready?

Confirm your estimated yardage, approved concrete specifications, placement method, truck access, and requested pour date. Include pumping requirements if applicable so dispatch can discuss your delivery needs.

Discuss My Concrete Pour Requirements

6. Check Mixer-Truck Access Before Delivery

A concrete mixer is much larger and heavier than a passenger vehicle.

Before delivery day, confirm that the site can safely accommodate the truck.

Your concrete delivery checklist should include:

  • Gate width
  • Turning room
  • Overhead wires
  • Low branches
  • Soft ground
  • Mud or unstable surfaces
  • Steep grades
  • Narrow roads
  • Weak shoulders
  • Equipment blocking the access route
  • Enough space for the mixer to enter, discharge, and leave

Do not wait until the truck arrives to identify an access problem.

If the truck cannot safely reach the intended placement point, the contractor may need to use another placement method.

7. Provide a Jobsite Contact

Every order should have a reliable person who can be reached during the delivery.

Provide:

  • Contact name
  • Mobile number
  • Role on the project

The jobsite contact should understand the project, know where the concrete is going, and be available if dispatch or the driver needs clarification.

For larger projects, it may also help to identify separate contacts for estimating, quality control, field operations, and billing.

8. Share the Project Schedule

A supplier needs more than the first pour date to understand a larger job.

For commercial or industrial work, provide as much of the expected schedule as practical:

  • Project start date
  • Estimated total concrete volume
  • Approximate yards per placement
  • Number of expected pours
  • Frequency of placements
  • Major schedule milestones
  • Restricted-delivery periods, if applicable

This information does not guarantee plant or truck availability. It simply gives the supplier a clearer picture of the project being planned.

Sorrento Lumber & Concrete also uses concrete delivery technology that tracks operational information such as slump, temperature, water added, water-to-cement ratio, volume, truck location, and estimated arrival information.

9. Identify Project-Specific Concrete Requirements

Not every job needs the same concrete.

Depending on the specifications, a project may call for:

  • Standard ready-mix
  • High-early-strength concrete
  • Fiber-reinforced concrete
  • Air-entrained concrete
  • Other project-specific mix requirements

Do not rely on the job type alone.

For example, saying “driveway mix” or “commercial mix” may not provide enough information. Instead, provide the required PSI and any additional requirements shown in the plans or specifications.

For an engineered project, follow the design documents rather than a generic recommendation.

10. Prepare the Crew Before the Truck Arrives

Ordering concrete is only one part of the pour.

Before delivery, the contractor should make sure the jobsite is actually ready.

Confirm that:

  • Forms are complete
  • Reinforcement is installed as required
  • Embedded items are in place
  • The subgrade is prepared
  • Placement equipment is ready
  • The pump is on site if needed
  • Enough workers are present
  • Finishing tools are ready
  • Access is clear
  • The crew knows where the concrete is being placed

Sorrento Lumber & Concrete supplies the ready-mix. The contractor handles placement and finishing.

A mixer arriving before the site or crew is ready can create delays that could have been avoided with better pre-pour planning.

Ready-Mix Concrete Order Checklist

Infographic titled “Ready-Mix Concrete Order Checklist” with a green and gold header, a photo of a concrete mixer truck at a jobsite, and a two-column table listing information needed before requesting a ready-mix concrete quote, including project location, project name, quantity, concrete requirements, plans or specifications, pour date, placement method, truck access, jobsite contact, project schedule, and special requirements.

What Helps When Requesting a Ready-Mix Concrete Quote?

The more complete the request, the easier it is for the supplier to understand the project.

At minimum, have these details ready:

Job location + estimated cubic yards + required PSI + requested pour date + project specifications

Know your project dimensions but aren’t sure how many cubic yards to request?

Sorrento Lumber & Concrete’s concrete quote page includes a yardage calculator and a quote form. Enter your project dimensions, review the estimated quantity, and provide your required PSI and jobsite details to begin your request.

Ordering Concrete by the Yard: What Not to Assume

“The supplier can tell me exactly how much I need.”

The supplier can review the information provided, but the contractor or project team should verify measurements and quantities before placing the order.

“A PSI number is the entire mix specification.”

Not always.

An engineered project may include requirements for air, slump, fibers, admixtures, testing, aggregate, or other performance criteria in addition to compressive strength.

“Giving a requested time means the truck is guaranteed for that exact time.”

No.

A requested date and time help the supplier understand your preferred schedule, but actual availability and delivery timing still need to be confirmed.

“The concrete supplier will pour and finish the slab.”

No.

Sorrento Lumber & Concrete supplies the ready-mix. Placement and finishing are handled by the contractor.

Final Concrete Delivery Checklist

Before submitting the order or quote request, make sure you can answer these questions:

  • Where is the job?
  • How many cubic yards are needed?
  • What PSI or mix requirements are specified?
  • Are plans or specifications available?
  • What date is the pour requested?
  • How will the concrete be placed?
  • Can the mixer safely access the site?
  • Who is the jobsite contact?
  • What does the overall project schedule look like?
  • Are there special testing, documentation, fiber, air, or other requirements?

Having those answers ready makes the ordering process clearer for both the customer and the supplier.

Ready for Your Next Concrete Pour?

Get Your Ready-Mix Concrete Quote Started

Submit your project address, estimated cubic yards, required PSI, specifications, preferred pour date, and placement details. Select Concrete on the quote form, or call dispatch to discuss your requirements. Delivery timing and pricing are confirmed during the quote process.

Sorrento Ready-Mix Concrete

Find Our Sorrento Concrete Plant

Ready to order concrete for your next project? Sorrento Lumber & Concrete supplies ready-mix throughout South Louisiana. Share your jobsite address, estimated cubic yards, and mix specifications with dispatch to coordinate supply from the appropriate concrete plant.

Sorrento Ready-Mix Concrete Plant

9563 Airline Highway
Sorrento, LA 70778

Concrete Dispatch: (225) 929-5060

Hours: Monday-Friday, 7 AM-5 PM

Get Directions to Sorrento Plant

Your project may be served by another Sorrento concrete plant. View All Concrete Locations or contact dispatch with your jobsite address.

Share the Post: