Why Special-Order Materials Need Early Planning
Framing is underway, but the custom windows are not ready. The openings are prepared, the installation crew has been scheduled, and the project cannot move forward as planned. The problem may have started weeks earlier when the required materials were not identified or ordered.
For Louisiana contractors and builders, special-order building materials should be identified during project planning rather than when installation is approaching.
Unlike commonly stocked supplies, custom or hard-to-find products may require additional sourcing, manufacturing, and approvals. Sorrento Lumber & Concrete offers building materials and special-order options through its Sorrento store, helping customers review their project requirements before purchasing.
Special-Order Material Planning
Need Custom Windows or Doors for Your Project?
Avoid last-minute ordering surprises. Share your approved plans, product dimensions, and required materials with Sorrento’s store team to discuss available special-order options.
Request a Special-Order QuoteWhich Building Materials Should Be Ordered Early?
Some products require more preparation than standard stock items.
Examples may include:
- Custom windows: Specific dimensions, configurations, and finishes.
- Special-order doors: Custom sizes, materials, and hardware requirements.
- Hard-to-find hardware: Products with unusual specifications or limited sourcing options.
- Specialty lumber: Nonstandard dimensions or other project-specific requirements that may require sourcing.
- Other custom building materials: Products requiring manufacturer selection or additional approvals.
Not every item in these categories is automatically a long-lead product.
Availability and manufacturing requirements depend on the exact item. Contractors should confirm current construction material lead times rather than assume all products follow the same schedule.
Sorrento Lumber & Concrete specifically offers special-order windows and doors and can discuss sourcing options for other hard-to-find materials.
Confirm Specifications Before Requesting a Special Order
An incomplete material description can create problems during ordering.
For effective contractor material planning, confirm the following information.
1. Final Dimensions
Verify measurements against the latest approved construction drawings.
For windows and doors, confirm rough openings, required product dimensions, and installation-related details with the responsible contractor or design professional.
2. Materials and Finishes
Identify required materials, colors, finishes, and configurations.
For example, a custom door order may require decisions about wood species, dimensions, glazing, hardware preparation, and finish.
3. Approved Manufacturers
Review the project specifications to determine whether a particular manufacturer or product is required.
For projects requiring submittal approval, do not assume an alternative manufacturer can be used without authorization.
4. Drawing Revisions
Confirm that the material list reflects the latest drawings and approved changes.
An outdated window schedule or door schedule could result in an incorrect order.
Procore’s construction submittal guidance explains the role of product documentation, approvals, and project specifications before purchasing construction materials.
How Construction Material Lead Times Affect the Schedule
Lead time generally refers to the period between ordering a product and its expected availability or delivery.
For specialty materials, the overall procurement process may also include:
- Finalizing product selections
- Completing required submittals
- Receiving design or owner approval
- Manufacturing or sourcing
- Transportation
- Delivery coordination
The project manager should work backward from the date the material must be available on-site.
For example, if installation is scheduled for a particular phase, identify when the product must arrive, then account for approvals, production, and transportation.
The construction procurement guide from Procore explains how long-lead materials and approval schedules influence procurement planning.
There is no universal lead time for custom building materials. Estimates should be confirmed for the specific product and updated when the project changes.
Custom Windows & Doors
Have Your Window or Door Specifications Ready?
Custom sizes, finishes, and manufacturer requirements can affect the ordering process. Bring your current plans and required-on-site date to discuss options and product-specific lead times.
Get a Window or Door QuoteSpecial-Order Building Materials Checklist
Before contacting a supplier, gather the following information:

This checklist supports material procurement planning by helping contractors provide the supplier with complete project information.
What Happens When Construction Plans Change?
Design changes can affect material quantities, dimensions, and product selections.
A revised window opening, for example, may change the size required for a previously selected window.
Before changing an existing order:
- Identify which drawings or specifications changed.
- Determine which ordered items are affected.
- Contact the supplier to review the order status.
- Confirm whether changes, cancellations, or substitutions are possible.
- Review any effect on pricing and delivery timing.
Some custom orders may have restrictions once manufacturing begins.
Contractors should confirm applicable order conditions before approving changes.
Maintaining an updated material list and revision record helps the project team identify which products still match the approved construction documents.
Coordinate Delivery and Storage Before Materials Arrive
Ordering materials early does not always mean delivering them early.
Project scheduling should consider available storage space, weather exposure, and the sequence of installation.
For Louisiana projects, moisture protection may be particularly important for wood products, doors, and other materials sensitive to prolonged exposure.
Before delivery, confirm:
- Available staging and storage space
- Suitable weather protection
- Jobsite access and unloading responsibilities
- Personnel available to inspect the delivery
- Appropriate handling requirements
The OSHA construction material storage requirements address stable stacking, clear passageways, and safe material storage.
Follow manufacturer instructions for product-specific handling and storage.
Planning Custom Window Orders
A residential contractor in Ascension Parish is preparing for a home construction project requiring windows in several sizes.
During the planning stage, the contractor identifies that certain windows must be specially ordered.
Before requesting pricing, the contractor confirms:
- Approved window dimensions
- Required frame materials and finishes
- Manufacturer requirements
- Current drawing revisions
- Expected installation schedule
- Available jobsite storage
The contractor then contacts the supplier to discuss the available products and estimated ordering timeline.
If the architect later changes an opening, the contractor checks whether the change affects the planned order before proceeding.
This approach helps connect purchasing decisions with the project’s actual construction requirements.
How Sorrento Lumber & Concrete Handles Special Orders
Sorrento Lumber & Concrete provides special ordering through its lumber yard and building-material store at 9563 Airline Highway in Sorrento, Louisiana.
Its verified special-order services include custom windows, doors, and hard-to-find hardware.
For windows and doors, customers can bring their dimensions, window schedules, or construction plans to discuss product options.
Customers can also review lumber and material options and ask about hard-to-find products.
Availability, lead times, and delivery arrangements should be confirmed for the specific order.
Avoid These Common Special-Order Mistakes
Ordering From Preliminary Plans
Measurements and specifications may change before final approval. Confirm the applicable drawing revisions before releasing the order.
Assuming All Materials Have the Same Lead Time
Stock products and manufactured-to-order items may follow different procurement schedules.
Confirm each item’s timeline individually.
Approving Substitutions Without Review
Alternative products may differ in dimensions, performance, appearance, or installation requirements.
Obtain the required project approvals before changing specified materials.
Overlooking Delivery Requirements
A product may be ready before the jobsite can safely receive or store it.
Coordinate delivery timing with installation needs and storage conditions.
Prepare Your Special-Order Materials Before Construction Needs Them
Special-order materials should be part of the project schedule, not a last-minute purchasing decision.
Confirm specifications, review drawing revisions, identify required-on-site dates, and discuss product availability before placing an order.
Sorrento Lumber & Concrete offers special-order windows, doors, and other building-material sourcing assistance through its Sorrento store.
Frequently Asked Questions
1. What are special order building materials?
Special order building materials are products sourced or manufactured for specific project requirements rather than purchased directly from regular inventory. Examples can include custom windows, doors, specialty lumber, and hard-to-find hardware.
2. How far in advance should special-order materials be ordered?
The appropriate timing depends on the product, manufacturer, approval requirements, and delivery location. Contractors should request current lead-time information for each item and coordinate ordering with the construction schedule.
3. Can special-order materials be changed after ordering?
Changes may be possible depending on the product, supplier terms, and manufacturing status. Confirm modification or cancellation options before approving changes to an existing order.
4. Does Sorrento Lumber & Concrete offer special orders?
Yes. Sorrento Lumber & Concrete offers special-order windows, doors, and hard-to-find materials through its Sorrento store. Customers can provide dimensions, plans, and project details for review.
Ready to Plan Your Material Order?
Get Your Special-Order Building Materials Quote
Need custom windows, doors, or hard-to-find materials? Send your current material list, required dimensions, approved specifications, and project timeline. Sorrento’s store team can review available options and ordering requirements.
Visit the Sorrento Store & Lumber Yard
Discuss special-order windows, doors, and building materials at 9563 Airline Highway, Sorrento, LA 70778.
Store Hours: Monday–Friday, 7 AM–5 PM
Phone: (225) 675-5375
Get Directions to Sorrento Store